In Development
Label

Promise headline

Shot: date
Real construction site photo
5 days a week
technical supervision by a qualified specialist
1 year
warranty on finishing
3
drainage systems
Every concrete pour
laboratory concrete testing
Label

Client risks at this stage

!Risk 01

How are we protected from flooding?

→ How we handle it

Our plot has as many as 3 drainage systems. The main one is built with a large reserve so that water does not stand on the plot even in heavy downpours. We have also installed a system that cuts off external water flows from neighbouring streets.

!Risk 02

How do we deal with mould and damp?

→ How we handle it

While building the structure, we followed every process for proper foundation waterproofing, which prevents ground moisture from reaching our walls. When casting columns and slabs, we used special hydrophobic (water-repellent) concrete additives. At the finishing stage, we will also use treatments that protect the facade from mould.

!Risk 03

How do we deal with dirty water and plumbing that breaks down very quickly?

→ How we handle it

We use plumbing only from Austrian and German manufacturers with extended warranties. In addition, the entire water supply system is fitted with filtration, which extends the life of the plumbing fixtures and prevents premature failure.

!Risk 04

What do we do for sound insulation inside the units?

→ How we handle it

Each villa is a separate structure with its own walls; with no adjoining neighbouring buildings, no vibration is transferred. All glazing will have sound-insulating properties.

Control system

What we check at every stage

StageWhat we checkReport formatFrequencyPayment
01Preparation

Drawings, site set-up, incoming materials

PhotoVideo
DailyPayment after acceptance
02Foundation

Formwork and concrete pouring against drawings

PhotoVideoChecklist
DailyPayment after acceptance
03Structure

Formwork, concrete, compliance with drawings

PhotoVideo
DailyPayment after acceptance
04Finishing

Finishing quality against drawings and specifications

PhotoVideoChecklist
DailyPayment after acceptance
05MEP

Electrical and plumbing works before handover

PhotoVideo
DailyPayment after acceptance
On site now

We took over a stalled build

Latest construction photo
Now in progress

ADG Flagman

Berawa, Canggu · 6 villas
00%Updated: date
Daily report
  • Progress vs planOK
  • Incoming materialsOK
  • Site safetyOK
Photo feed →
Report · week 00Date
  • [x] ItemOK
  • [x] ItemOK
  • [x] ItemOK
Sample report

This is what a week on site looks like on paper

Get a sample report
Label

Warranties

01

What is covered

Structure and finishing.

02

Warranty period

Structure: for the entire leasehold term, including extensions. Finishing: 1 year.

03

How it is set out in the contract

These terms are fixed in the contract.

Case

Proof a design bureau can't offer

After
After
Before
Before

Yatori: 8 villas back in operation

$15–16k
per villa, including common areas and pool
  • LocationCanggu
  • Units8 villas
  • Type1–2 bedroom
  • StatusCompleted
FAQ

Heading

Ask a question
Ownership for foreigners — question
Construction timeline — question
Remote oversight

Every stage of construction is recorded on video, and all project documentation is carefully checked. This keeps the project fully transparent and strictly on the construction schedule.

Warranty

We provide a structural warranty for the entire leasehold term, including extensions, and a 1-year warranty on finishing, with these terms fixed in the contract.

How often reports arrive

We have built a transparent system for overseeing the construction contractor with weekly reporting, which lets you track the quality of work and adherence to deadlines. This approach minimises the risk of delays and ensures compliance with all technical requirements.

How payment works — question
If deadlines slip — question
Get in touch